This CFD Infrastructure project will include the construction of the following to support the Verdin community:

 

OFF-SITE IMPROVEMENTS:

  • 16” water line segments on Sonoran Desert Drive and Cave Creek Road.

  • Dual 12” force main sewer pipeline.

  • Intersection improvements including traffic signal modifications and two new signalized intersections.

  • Installation of pipes at the three bridges and box/pipe culvert crossings.

 

ON-SITE IMPROVEMENTS:

  • 1 MGD lift station.

  • Dual 12” force main sewer pipeline.

  • Dry utilities such as electric and communications conduit, and storm drain facilities. 

  • 12” water main pipeline.

  • Roadway infrastructure, including street lighting, landscaping/irrigation, concrete curb, gutter, sidewalk and asphalt paving.

  • Community multi-use trail (not shown on map).

Revised CFD Improvement Graphic.png

Planned CFD Improvements